热门标签

皇冠博彩:TCS bags RM108.38mil construction job for Moxy Hotel

时间:1个月前   阅读:14   评论:2

皇冠 怎么 注册www.hg9988.vip)是皇冠体育官方线上24小时为您解决皇冠 怎么 注册、皇冠代理 怎么 开户、皇冠会员 怎么 注册等问题。

KUALA LUMPUR: TCS Group Holdings Bhd's subsidiary TCS Construction Sdn Bhd has secured an award from IOI City Hotel Sdn Bhd for the construction of the main building works of Moxy Hotel for RM108.38mil.

In a filing with Bursa Malaysia, the construction firm said the contract will be completed in 16 months form Sept 1, 2022 to Dec 31, 2023.

"The contract is expected to contribute positively to the future earnings and net assets of TCS for

,

皇冠博彩www.hg9988.vip)是皇冠体育官方博彩平台,开放皇冠信博彩代理申请、博彩会员开户的线上博彩的官方平台。

,

the duration of the contract.

"TCS Group intends to fund the Contract via internally generated funds and/or borrowings," it said.

At 12.30pm, shares in TCS last traded 0.5 sen or 1.85% lower at 26.5 sen a share on the back of 152,600 units traded.


转载说明:本文转载自Sunbet。

上一篇:澳5计划(www.a55555.net):宜选国企较稳健 敲中海保利物业 内房政策渐宽 物管股有运行

下一篇:赣锋锂业(01772.HK)前三季度净利147.95亿元 同比增长498.31%

网友评论